Invitation to Bid: East Control Tower Road Improvements Project
ADVERTISEMENT
EAST CONTROL TOWER ROAD IMPROVEMENTS
CENTENNIAL AIRPORT
ENGLEWOOD, COLORADO
Sealed bids for the East Control Tower Road Improvements project, at Centennial Airport, Englewood, Colorado, will be received by the Arapahoe County Public Airport Authority, 7565 South Peoria Street, Englewood, Colorado 80112, until 10:00 a.m., local time, on October 5, 2026, and then opened, read aloud and canvassed.
The project includes pavement rehabilitation along East Control Tower Road. Major work items include asphalt milling and paving, crack repair, and pavement marking installation.
A complete set of Plans and Bidding Requirements and Contract Documents may be obtained on or after September 10, 2026 on Rocky Mountain E-Purchasing System at https://www.bidnetdirect.com/colorado.
All bidders are advised to examine the site to become familiar with all site conditions. The project will be discussed and shown to interested bidders at 10:00 a.m., local time on September 18, 2026, at the Arapahoe County Public Airport Authority, 7565 South Peoria Street, Englewood, Colorado 80112.
Each bid must be accompanied by a Certified Check or Cashier’s Check in the amount of not less than five percent (5%) of the total bid, made payable to the Arapahoe County Public Airport Authority, or by Bid Bond in like amount executed by a Surety Company.
The Bidder must supply all information required by the Bidding Requirements and Contract Documents. The Arapahoe County Public Airport Authority reserves the right to waive any informality in or to reject any or all portions of the various bid items or reject any and all bids and make the award deemed in the best interest of the Airport Authority. No proposal may be withdrawn for a period of 30 days from the opening thereof.
Any questions must be submitted to Chris Dodge, JACOBS, via email to Christopher.Dodge@jacobs.com. Questions are due by 10:00 a.m., September 28, 2026. Questions received after this time will not be accepted.
ITB: East Control Tower Road Improvements
